Ready To Find Your Car

Cars Bids History

Find daily updates from Copart auctions

2016 BMW M2 BLUE, WBS1H9C56GV786093

1. Lot: 24680980

Vehicle Details:

Doc Type BILL OF SALE (Washington)
Car Status Vehicle Won't Start
Odometer: 21385.0(ACTUAL)
Primary Damage Left & Right Side
Secondary Damage
Estimate Retail Value 42950.0
Recovery Cost 31046.0
VIN WBS1H9C56GV786093
Seller Geico Insurance
Notes

Vehicle Type AUTOMOBILE
Body Style Coupe 2 Door
Color BLUE
Key Key(s) Present
Drive Rear Wheel Drive
Transmission Automatic Transmission
Fuel Gasoline
Engine I6 FI DOHC 24V NF4
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2019-05-08 22:40:33.0 Seattle / Lane - Lane A 11175.0 Sold! Oregon city-OR

2. Lot: 25294942

Vehicle Details:

Doc Type BILL OF SALE (Washington)
Car Status Vehicle Won't Start
Odometer: 0.0(Inoperable Digital Dash)
Primary Damage Right Side
Secondary Damage Left Rear
Estimate Retail Value 43282.0
Recovery Cost
VIN WBS1H9C56GV786093
Seller Khar Auto
Notes BILL OF SALE

Vehicle Type AUTOMOBILE
Body Style Coupe 2 Door
Color BLUE
Key Key(s) Present
Drive Rear Wheel Drive
Transmission Automatic Transmission
Fuel Gasoline
Engine 3.0L I6 FI DOHC 24V NF4
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2019-06-06 21:54:54.0 Portland / Lane - 9800.0 Sold! Oregon city-OR


Another Lots with same model and same damage

Random auction lots from previous week