Ready To Find Your Car

Cars Bids History

Find daily updates from Copart auctions

2016 BMW M4 WHITE, WBS3R9C53GK339096

1. Lot: 31934118

Vehicle Details:

Doc Type SALVAGE CERTIFICATE
Car Status RUNS AND DRIVES
Odometer: 11663.0(NOT ACTUAL)
Primary Damage FRONT END
Secondary Damage REAR END
Estimate Retail Value 63271.0
Recovery Cost 15306.0
VIN WBS3R9C53GK339096
Seller
Notes

Vehicle Type AUTOMOBILE
Body Style COUPE
Color WHITE
Key YES
Drive Rear-wheel drive
Transmission
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2018-05-03 01:39:27.0 Little Rock / Lane - A 387 23200.0 Sold on Approval! Starting Bid
2 2018-04-30 21:49:36.0 Northern Virginia / Lane - A 3732 23200.0 Sold on Approval! CALIFORNIA
3 2018-04-26 01:12:17.0 Fremont / Lane - B 703 24800.0 Sold on Approval! Starting Bid
4 2018-04-23 19:37:15.0 East Bay / Lane - B 1357 24800.0 Sold on Approval! CALIFORNIA

2. Lot: 48235207

Vehicle Details:

Doc Type SALVAGE CERTIFICATE
Car Status ENHANCED VEHICLES
Odometer: 0.0(NOT ACTUAL)
Primary Damage REAR END
Secondary Damage UNDERCARRIAGE
Estimate Retail Value 60512.0
Recovery Cost 43054.5
VIN WBS3R9C53GK339096
Seller
Notes

Vehicle Type AUTOMOBILE
Body Style COUPE
Color WHITE
Key YES
Drive Rear-wheel drive
Transmission
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2018-02-27 20:19:25.0 Metro DC / Lane - A 445 18200.0 Sold! Starting Bid


Another Lots with same model and same damage

2018 BMW M4

2018 BMW M4,

Sold! Odometer: 46904.0(ACTUAL) +
Damage: SIDE/FRONT END

View Auction History

2015 BMW M4

2015 BMW M4,

Sold! Odometer: 123965.0(ACTUAL) +
Damage: FRONT END/

View Auction History

2018 BMW M4

2018 BMW M4,

Sold! Odometer: 76428.0(ACTUAL) +
Damage: FRONT END/

View Auction History

2019 BMW M4

2019 BMW M4,

Sold! Odometer: 69653.0(ACTUAL) +
Damage: FRONT END/

View Auction History

2020 BMW M4

2020 BMW M4,

Sold! Odometer: 77179.0(ACTUAL) +
Damage: FRONT END/SIDE

View Auction History

Random auction lots from previous week