Ready To Find Your Car

Cars Bids History

Find daily updates from Copart auctions

2024 BMW M4 COMPETITION BLUE, WBS33BA09RCN82182

1. Lot: 73890454

Vehicle Details:

Doc Type CERTIFICATE OF DESTRUCTION
Car Status Enhanced Vehicles
Odometer: 6643.0(ACTUAL)
Primary Damage WATER/FLOOD
Secondary Damage
Estimate Retail Value 87769.0
Recovery Cost 91080.66
VIN WBS33BA09RCN82182
Seller
Notes VEH LOC @ COP OKEECHOBEE SUB

Vehicle Type AUTOMOBILE
Body Style
Color BLUE
Key YES
Drive All wheel drive
Transmission AUTOMATIC
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2024-10-30 14:00:00.0 FL - Tampa South / Lane - B 27750.0 Sold! TXUSA

2. Lot: 79039384

Vehicle Details:

Doc Type CERTIFICATE OF DESTRUCTION
Car Status Enhanced Vehicles
Odometer: 6643.0(NOT ACTUAL)
Primary Damage WATER/FLOOD
Secondary Damage
Estimate Retail Value 87869.0
Recovery Cost 0.0
VIN WBS33BA09RCN82182
Seller
Notes

Vehicle Type AUTOMOBILE
Body Style
Color GRAY
Key YES
Drive All wheel drive
Transmission
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2024-11-19 18:00:00.0 TX - Houston / Lane - F 35250.0 Sold on Approval! TXUSA
2 2024-11-15 18:00:00.0 TX - Houston / Lane - C 39250.0 Sold on Approval! TXUSA


Another Lots with same model and same damage

2022 BMW M4 COMPETITION

2022 BMW M4 COMPETITION,

Sold! Odometer: 0.0(NOT ACTUAL) +
Damage: WATER/FLOOD/FRONT END

View Auction History

2024 BMW M4 COMPETITION

2024 BMW M4 COMPETITION,

Sold on Approval! Odometer: 16265.0(ACTUAL) +
Damage: WATER/FLOOD/

View Auction History

2024 BMW M4 COMPETITION

2024 BMW M4 COMPETITION,

Sold on Approval! Odometer: 16265.0(ACTUAL) +
Damage: WATER/FLOOD/

View Auction History

2021 BMW M4 COMPETITION

2021 BMW M4 COMPETITION,

Sold! Odometer: 28064.0(ACTUAL) +
Damage: WATER/FLOOD/

View Auction History

2024 BMW M4 COMPETITION

2024 BMW M4 COMPETITION,

Sold on Approval! Odometer: 16265.0(ACTUAL) +
Damage: WATER/FLOOD/

View Auction History

Random auction lots from previous week