Ready To Find Your Car
Find daily updates from Copart auctions
1. Lot: 25098518
| Doc Type | NONREPAIRABLE TITLE-FLOOD |
| Car Status | RUNS AND DRIVES |
| Odometer: | 6924.0(NOT ACTUAL) |
| Primary Damage | WATER/FLOOD |
| Secondary Damage | |
| Estimate Retail Value | 129548.0 |
| Recovery Cost | 0.0 |
| VIN | WBS6E9C59HG437286 |
| Seller | |
| Notes | |
|
|
|
| Vehicle Type | AUTOMOBILE |
| Body Style | SEDAN 4D |
| Color | WHITE |
| Key | YES |
| Drive | Rear-wheel drive |
| Transmission | |
| Fuel | GAS |
| Engine | 4.4L 8 |
| Cylinders | 8 |
| N | Date | Auction | Participants | Auction Type | Last Bid | Sold Status | Buyer Location |
|---|---|---|---|---|---|---|---|
| 1 | 2018-03-23 21:51:37.0 | Roanoke / Lane - A | 7493 | 41000.0 | Sold on Approval! | INDIANA | |
| 2 | 2018-03-09 20:31:30.0 | Houston-North / Lane - B | 6277 | 44750.0 | Sold on Approval! | TEXAS | |
| 3 | 2018-03-09 20:31:30.0 | Houston-North / Lane - B | 6296 | 44750.0 | Sold on Approval! | TEXAS | |
| 4 | 2018-03-02 21:17:28.0 | Detroit / Lane - A | 5342 | 46000.0 | Sold on Approval! | TEXAS | |
| 5 | 2018-03-02 21:17:28.0 | Detroit / Lane - A | 5332 | 46000.0 | Sold on Approval! | TEXAS | |
| 6 | 2018-02-23 20:40:49.0 | Memphis / Lane - A | 4283 | 54500.0 | Sold on Approval! | TEXAS |
2. Lot: 39047837
| Doc Type | NONREPAIRABLE TITLE-FLOOD |
| Car Status | ENHANCED VEHICLES |
| Odometer: | 0.0(NOT ACTUAL) |
| Primary Damage | WATER/FLOOD |
| Secondary Damage | |
| Estimate Retail Value | 0.0 |
| Recovery Cost | 0.0 |
| VIN | WBS6E9C59HG437286 |
| Seller | State Farm Insurance |
| Notes | |
|
|
|
| Vehicle Type | AUTOMOBILE |
| Body Style | SEDAN 4D |
| Color | WHITE |
| Key | YES |
| Drive | Rear-wheel drive |
| Transmission | |
| Fuel | GAS |
| Engine | 4.4L 8 |
| Cylinders | 8 |
| N | Date | Auction | Participants | Auction Type | Last Bid | Sold Status | Buyer Location |
|---|---|---|---|---|---|---|---|
| 1 | 2018-01-30 20:47:28.0 | Atlantic Canada Auction / Lane - A | 3593 | 39250.0 | Sold! | TEXAS |