Ready To Find Your Car

Cars Bids History

Find daily updates from Copart auctions

2015 BMW M4 WHITE, WBS3U9C54FP967913

1. Lot: 42736538

Vehicle Details:

Doc Type CERT OF TITLE OR SALVAGE ACQ
Car Status ENHANCED VEHICLES
Odometer: 45339.0(ACTUAL)
Primary Damage FRONT END
Secondary Damage
Estimate Retail Value 0.0
Recovery Cost 0.0
VIN WBS3U9C54FP967913
Seller
Notes

Vehicle Type AUTOMOBILE
Body Style CONVERTI
Color WHITE
Key YES
Drive Rear-wheel drive
Transmission
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2018-08-22 19:45:24.0 TX - Houston / Lane - C 2190 12400.0 Sold on Approval! CALIFORNIA

2. Lot: 46903558

Vehicle Details:

Doc Type DIS/DLR/EXP ONLY CLEAN TITLE
Car Status ENGINE START PROGRAM
Odometer: 13543.0(ACTUAL)
Primary Damage FRONT END
Secondary Damage
Estimate Retail Value 48709.0
Recovery Cost 0.0
VIN WBS3U9C54FP967913
Seller
Notes

Vehicle Type AUTOMOBILE
Body Style CONVERTI
Color WHITE
Key YES
Drive Rear-wheel drive
Transmission
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2018-10-01 21:41:09.0 CA - Los Angeles / Lane - E 5087 16200.0 Sold on Approval! CALIFORNIA
2 2018-09-27 01:06:51.0 *NCS - Pacific Region / Lane - C 733 18200.0 Sold on Approval! Starting Bid
3 2018-09-24 19:27:06.0 CA - Los Angeles / Lane - D 1260 16100.0 Sold on Approval! CALIFORNIA


Another Lots with same model and same damage

2020 BMW M4

2020 BMW M4,

Sold! Odometer: 16250.0(ACTUAL) +
Damage: FRONT END/

View Auction History

2018 BMW M4

2018 BMW M4,

Sold! Odometer: 33879.0(ACTUAL) +
Damage: FRONT END/FRAME DAMAGE

View Auction History

2015 BMW M4

2015 BMW M4,

Sold! Odometer: 93872.0(ACTUAL) +
Damage: FRONT END/

View Auction History

2018 BMW M4

2018 BMW M4,

Sold! Odometer: 103690.0(ACTUAL) +
Damage: SIDE/FRONT END

View Auction History

2015 BMW M4

2015 BMW M4,

Sold! Odometer: 178191.0(ACTUAL) +
Damage: SIDE/FRONT END

View Auction History

2017 BMW M4

2017 BMW M4,

Sold! Odometer: 44625.0(ACTUAL) +
Damage: FRONT END/SIDE

View Auction History

Random auction lots from previous week