Ready To Find Your Car

Cars Bids History

Find daily updates from Copart auctions

2023 BMW M3 COMPETITION WHITE, WBS33AY00PFN54332

1. Lot: 69035605

Vehicle Details:

Doc Type CERT OF TITLE-SALVAGE FLOOD
Car Status Engine Start Program
Odometer: 22981.0(ACTUAL)
Primary Damage WATER/FLOOD
Secondary Damage REAR END
Estimate Retail Value 72263.0
Recovery Cost 51957.55
VIN WBS33AY00PFN54332
Seller
Notes

Vehicle Type AUTOMOBILE
Body Style
Color WHITE
Key YES
Drive Rear-wheel drive
Transmission AUTOMATIC
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2025-10-13 14:00:00.0 NJ - Trenton / Lane - C 41250.0 Sold! TXUSA

2. Lot: 86850155

Vehicle Details:

Doc Type CERT OF TITLE-SALVAGE FLOOD
Car Status Run and Drive
Odometer: 22981.0(ACTUAL)
Primary Damage WATER/FLOOD
Secondary Damage
Estimate Retail Value 86847.0
Recovery Cost 0.0
VIN WBS33AY00PFN54332
Seller
Notes

Vehicle Type AUTOMOBILE
Body Style
Color WHITE
Key YES
Drive Rear-wheel drive
Transmission
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2025-12-02 18:00:00.0 TX - Houston / Lane - C 55500.0 Sold on Approval! TXUSA
2 2025-11-21 18:00:00.0 TX - Houston / Lane - B 57500.0 Sold on Approval! FLUSA
3 2025-11-18 18:00:00.0 TX - Houston / Lane - C 58000.0 Sold on Approval! TXUSA
4 2025-11-14 18:00:00.0 TX - Houston / Lane - C 57500.0 Sold on Approval! TXUSA
5 2025-11-11 18:00:00.0 TX - Houston / Lane - B 59000.0 Sold on Approval! NHUSA


Another Lots with same model and same damage

2023 BMW M3 COMPETITION

2023 BMW M3 COMPETITION,

Sold! Odometer: 0.0(NOT ACTUAL) +
Damage: WATER/FLOOD/STRIPPED

View Auction History

2023 BMW M3 COMPETITION

2023 BMW M3 COMPETITION,

Sold! Odometer: 22981.0(ACTUAL) +
Damage: WATER/FLOOD/REAR END

View Auction History

2022 BMW M3 COMPETITION

2022 BMW M3 COMPETITION,

Sold! Odometer: 0.0(NOT ACTUAL) +
Damage: WATER/FLOOD/

View Auction History

2023 BMW M3 COMPETITION

2023 BMW M3 COMPETITION,

Sold on Approval! Odometer: 22981.0(ACTUAL) +
Damage: WATER/FLOOD/

View Auction History

Random auction lots from previous week