2024 BMW M4 COMPETITION
Sold! Odometer: 25303.0(ACTUAL) +
Damage: SIDE/UNDERCARRIAGE
Ready To Find Your Car
Find daily updates from Copart auctions
1. Lot: 39159644
| Doc Type | MV-907A SALVAGE CERTIFICATE |
| Car Status | Run and Drive |
| Odometer: | 2176.0(ACTUAL) |
| Primary Damage | SIDE |
| Secondary Damage | FRONT END |
| Estimate Retail Value | 98442.0 |
| Recovery Cost | 117550.79 |
| VIN | WBS43AZ01RCP36371 |
| Seller | |
| Notes | |
|
|
|
| Vehicle Type | AUTOMOBILE |
| Body Style | |
| Color | BLACK |
| Key | YES |
| Drive | All wheel drive |
| Transmission | AUTOMATIC |
| Fuel | GAS |
| Engine | 3.0L 6 |
| Cylinders | 6 |
| N | Date | Auction | Participants | Auction Type | Last Bid | Sold Status | Buyer Location |
|---|---|---|---|---|---|---|---|
| 1 | 2024-03-04 15:00:00.0 | NJ - Trenton / Lane - B | 49500.0 | Sold! | ARUSA |
Sold! Odometer: 25303.0(ACTUAL) +
Damage: SIDE/UNDERCARRIAGE
Sold! Odometer: 66153.0(ACTUAL) +
Damage: SIDE/REAR END
Sold! Odometer: 0.0(NOT ACTUAL) +
Damage: FRONT END/SIDE
Sold! Odometer: 34373.0(ACTUAL) +
Damage: SIDE/FRONT END
Sold! Odometer: 36989.0(ACTUAL) +
Damage: SIDE/REAR END