Ready To Find Your Car

Cars Bids History

Find daily updates from Copart auctions

2024 BMW M4 COMPETITION GRAY, WBS43AZ03RCN76347

1. Lot: 60753743

Vehicle Details:

Doc Type MV-907A SALVAGE CERTIFICATE
Car Status Enhanced Vehicles
Odometer: 722.0(ACTUAL)
Primary Damage STRIPPED
Secondary Damage
Estimate Retail Value 90023.0
Recovery Cost 84493.18
VIN WBS43AZ03RCN76347
Seller
Notes

Vehicle Type AUTOMOBILE
Body Style
Color GRAY
Key NO
Drive All wheel drive
Transmission AUTOMATIC
Fuel GAS
Engine 3.0L 6
Cylinders 6
N Date Auction Participants Auction Type Last Bid Sold Status Buyer Location
1 2023-08-22 14:00:00.0 NY - Newburgh / Lane - C 17100.0 Sold! ILUSA


Another Lots with same model and same damage

Random auction lots from previous week